Building A:
- Total: 4,050.82 m²
- Pilot plant for processing food and beverages of animal and plant origin: 2,542.01 m²
- Offices: 1,026.19 m²
- Visitors’ corridor: 250.01 m²
- Machine room and auxiliary rooms: 130.21 m²
- Auxiliary areas: 77.40 m²
- Laboratories: 25 m²
- Processing and preservation technologies
- Alternative protein innovation centre
- Physical analysis and process analysis technologies (sensors) laboratory
- Sensory analysis, neuroscience and consumer laboratory
- Co-creation classrooms
- Auxiliary and common use spaces
Building B:
- Total: 2,695.3 m²
- Biosafety Level 2 pilot plant: 800 m²
- Offices: 665.2 m²
- BSL2 chemistry, chromatography and microbiology laboratories: 569 m²
- Warehouses and interior courtyard: 293.1 m²
- Auditorium: 192 m² (with capacity for around 90 people) and integrated demonstration plant.
- Auxiliary and common use spaces: 88 m²
- Sensory analysis room: 23 m²
- Slaughterhouse with waiting room and accommodation for different animal species. For conducting experimental studies, with controlled environmental conditions: 289.87 m²
- Animal stunning area: 90.4 m²
- Pens: 85.47 m²
- Slaughterhouse and experimental cutting room: 57 m²
The area also has two experimental farms:
IRTA Building C in Monells (Building C)
EVAM (Monells Vacuum Station) (Building D)
The area also has two experimental farms: