Start date: 01/02/2024
End date: 05/05/2026
Project Code: V4284_16434
Acronym: GO ARACZEA_COOP
The main objective of the project is to find a way to return to a natural balance that allows for an adequate control of the damage caused by red spider mites by natural enemies. This return is proposed by testing and evaluating the following control strategies:
The actions are planned in two of the most representative areas of the crop, namely the western part of the Lleida region (Segrià) and the irrigated area of the Urgell canal (Pla d’Urgell, among others).
Action of the Strategic Plan of the PAC 2023-2027 co-funded by: