NBS2 building: Building with four animal accommodation rooms and a necropsy room, equipped with biocontainment systems (air filtration system, waste treatment, SAS, etc.), for experimental studies with pathogenic microorganisms classified as risk 2.
Building 2: Building with five rooms for fattening pigs and one room for piglets in the transition phase.
Building 3: Building with six rooms equipped with automatic feeders for individualized control of feed consumption , and for climate monitoring and animal behavior.
Building 4: Building equipped with automatic feeders for individualized control of feed consumption , and for climate monitoring and animal behavior.