{"id":84809,"date":"2025-03-12T13:17:35","date_gmt":"2025-03-12T12:17:35","guid":{"rendered":"https:\/\/www.irta.cat\/?post_type=noticia&#038;p=84809"},"modified":"2025-03-12T15:39:14","modified_gmt":"2025-03-12T14:39:14","slug":"lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy","status":"publish","type":"noticia","link":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/","title":{"rendered":"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy."},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><a href=\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg\" class=\"fancybox irta-lightbox-bridge\" data-fancybox=\"irta-images\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"599\" src=\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord-1024x599.jpg\" alt=\"\" class=\"wp-image-84784\" srcset=\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord-1024x599.jpg 1024w, https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord-300x175.jpg 300w, https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord-768x449.jpg 768w, https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg 1300w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>A Commitment to Sustainability and Efficiency in Waste Management<\/strong><\/h2>\n\n\n\n<p>IRTA will begin the construction of a biogas plant at Mas Bov\u00e9 (1), where several pig and poultry farming facilities are already located. Until now, waste management from these farms has been handled by an external service. With this new plant, the goal is to<strong> internalize waste treatment<\/strong> while harnessing it to <strong>generate biogas<\/strong>\u2014 a renewable energy source that will be used for the <strong>self-consumption<\/strong> of IRTA\u2019s own facilities.<\/p>\n\n\n\n<p>In addition to energy production, the plant will produce a digested material that will be treated and transformed into water suitable for irrigation. In the context of ongoing drought, this initiative will contribute to a<strong> more efficient management of water resources, facilitating irrigation at IRTA Mas Bov\u00e9&#8217;s agricultural fields<\/strong>. The plant will be managed directly by IRTA.<\/p>\n\n\n\n<p>Moreover, the biogas plant will serve a dual purpose: besides enhancing IRTA\u2019s internal sustainability, it will function as a<strong> demonstration facility<\/strong> to transfer knowledge to the agri-food sector and as a platform for experimentation with future trials and technological developments in bioenergy and waste management.<\/p>\n\n\n\n<p>The construction of a second biogas plant is already planned as part of IRTA\u2019s strategic plan. This new facility (2) will share the same goal of sustainable waste management and renewable energy production but will incorporate different technologies to explore new solutions in the sector.<\/p>\n\n\n\n<p>(1) This project, as established in the Resolution of the Secretariat of State for Energy and the Presidency of E.P.E Instituto para la Diversificaci\u00f3n y Ahorro de la Energ\u00eda (IDAE), M.P., is funded by the \u201cFirst Call for the Incentive Program for Singular Projects of Biogas Installations, within the framework of the \u00abRecovery, Transformation, and Resilience Plan \u2013 Funded by the European Union\u2013NextGenerationEU\u00bb.\u201d Its regulatory bases are established in Order TED\/706\/2022, of July 21, 2022, from the Ministry for the Ecological Transition and the Demographic Challenge (Official State Gazette No. 178, July 26, 2022).<\/p>\n\n\n\n<p>(2) This project is being carried out with the support of the \u201cAGROECONOMIA CIRCULAR\u201d and \u201cBIOENERGIA\u201d projects, funded by the Climate Fund Projects line of the Government of Catalonia.<\/p>\n","protected":false},"featured_media":84784,"template":"","categoria_noticia":[],"etiqueta_filtrar_noticia":[],"class_list":["post-84809","noticia","type-noticia","status-publish","has-post-thumbnail","hentry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.6 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\r\n<title>L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA<\/title>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA\" \/>\r\n<meta property=\"og:description\" content=\"A Commitment to Sustainability and Efficiency in Waste Management IRTA will begin the construction of a biogas plant at Mas Bov\u00e9 (1), where several pig and poultry farming facilities are already located. Until now, waste management from these farms has been handled by an external service. With this new plant, the goal is to internalize [&hellip;]\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/\" \/>\r\n<meta property=\"og:site_name\" content=\"IRTA\" \/>\r\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/irtacat\" \/>\r\n<meta property=\"article:modified_time\" content=\"2025-03-12T14:39:14+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"1300\" \/>\r\n\t<meta property=\"og:image:height\" content=\"760\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:site\" content=\"@irtacat\" \/>\r\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"3 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/\",\"url\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/\",\"name\":\"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA\",\"isPartOf\":{\"@id\":\"https:\/\/www.irta.cat\/en\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg\",\"datePublished\":\"2025-03-12T12:17:35+00:00\",\"dateModified\":\"2025-03-12T14:39:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage\",\"url\":\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg\",\"contentUrl\":\"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg\",\"width\":1300,\"height\":760},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Inici\",\"item\":\"https:\/\/www.irta.cat\/en\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy.\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.irta.cat\/en\/#website\",\"url\":\"https:\/\/www.irta.cat\/en\/\",\"name\":\"IRTA\",\"description\":\"Institut de Recerca i Tecnologia Agroaliment\u00e0ries\",\"publisher\":{\"@id\":\"https:\/\/www.irta.cat\/en\/#organization\"},\"alternateName\":\"%%sitename%% %%sep%% %%title%%\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.irta.cat\/en\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.irta.cat\/en\/#organization\",\"name\":\"IRTA\",\"url\":\"https:\/\/www.irta.cat\/en\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.irta.cat\/en\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.irta.cat\/wp-content\/uploads\/2023\/04\/Logo-IRTA-verm.png\",\"contentUrl\":\"https:\/\/www.irta.cat\/wp-content\/uploads\/2023\/04\/Logo-IRTA-verm.png\",\"width\":1250,\"height\":500,\"caption\":\"IRTA\"},\"image\":{\"@id\":\"https:\/\/www.irta.cat\/en\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/irtacat\",\"https:\/\/x.com\/irtacat\"]}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/","og_locale":"en_US","og_type":"article","og_title":"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA","og_description":"A Commitment to Sustainability and Efficiency in Waste Management IRTA will begin the construction of a biogas plant at Mas Bov\u00e9 (1), where several pig and poultry farming facilities are already located. Until now, waste management from these farms has been handled by an external service. With this new plant, the goal is to internalize [&hellip;]","og_url":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/","og_site_name":"IRTA","article_publisher":"https:\/\/www.facebook.com\/irtacat","article_modified_time":"2025-03-12T14:39:14+00:00","og_image":[{"width":1300,"height":760,"url":"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_site":"@irtacat","twitter_misc":{"Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/","url":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/","name":"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy. &#187; IRTA","isPartOf":{"@id":"https:\/\/www.irta.cat\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage"},"image":{"@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage"},"thumbnailUrl":"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg","datePublished":"2025-03-12T12:17:35+00:00","dateModified":"2025-03-12T14:39:14+00:00","breadcrumb":{"@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#primaryimage","url":"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg","contentUrl":"https:\/\/www.irta.cat\/wp-content\/uploads\/2025\/03\/IRTA-Mas-Bove-Simulacio-Planta-Biogas-vista-Nord.jpg","width":1300,"height":760},{"@type":"BreadcrumbList","@id":"https:\/\/www.irta.cat\/en\/noticia\/lirta-will-build-a-biogas-plant-at-mas-bove-to-optimize-waste-management-and-generate-renewable-energy\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Inici","item":"https:\/\/www.irta.cat\/en\/"},{"@type":"ListItem","position":2,"name":"L\u2019IRTA will build a biogas plant at Mas Bov\u00e9 to optimize waste management and generate renewable energy."}]},{"@type":"WebSite","@id":"https:\/\/www.irta.cat\/en\/#website","url":"https:\/\/www.irta.cat\/en\/","name":"IRTA","description":"Institut de Recerca i Tecnologia Agroaliment\u00e0ries","publisher":{"@id":"https:\/\/www.irta.cat\/en\/#organization"},"alternateName":"%%sitename%% %%sep%% %%title%%","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.irta.cat\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.irta.cat\/en\/#organization","name":"IRTA","url":"https:\/\/www.irta.cat\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.irta.cat\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.irta.cat\/wp-content\/uploads\/2023\/04\/Logo-IRTA-verm.png","contentUrl":"https:\/\/www.irta.cat\/wp-content\/uploads\/2023\/04\/Logo-IRTA-verm.png","width":1250,"height":500,"caption":"IRTA"},"image":{"@id":"https:\/\/www.irta.cat\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/irtacat","https:\/\/x.com\/irtacat"]}]}},"_links":{"self":[{"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/noticia\/84809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/noticia"}],"about":[{"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/types\/noticia"}],"version-history":[{"count":0,"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/noticia\/84809\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/media\/84784"}],"wp:attachment":[{"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/media?parent=84809"}],"wp:term":[{"taxonomy":"categoria_noticia","embeddable":true,"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/categoria_noticia?post=84809"},{"taxonomy":"etiqueta_filtrar_noticia","embeddable":true,"href":"https:\/\/www.irta.cat\/en\/wp-json\/wp\/v2\/etiqueta_filtrar_noticia?post=84809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}